Buyer-side ready-mix procurement

Control ready-mix costs from quote to invoice.

Project-backed RFQs, true landed cost, ticket capture, and invoice variance — with clean handoffs to the systems your team already uses.

See it in action

Every step, with your data — not slideware.

The screens below are how the product looks once your suppliers, quotes, tickets, and invoices are in. Numbers below are illustrative.

Step 1 · Request

Send a project-backed RFQ to every supplier in one click.

Email or AI-assisted phone — same packet, same line-item structure. Status tracked from request through reply, with auto-reminders if a supplier goes quiet.

See RFQ Automation
RFQ #408 — 80 CY · 4,000 PSI · Houston, TX · sent 3 hr ago
  • Lone Star Ready Mix
    mike@lonestar.com
    $168/CY · 7-day validity
    Replied · 47 min
    Responded
  • Gulf Coast Concrete
    AI-assisted call · 4:21
    $172/CY · 14-day validity
    Quote captured · 2 hr
    Responded
  • Texas Sterling Ready Mix
    james@txsterling.com
    $175/CY · 7-day validity
    Replied · 3 hr
    Responded
  • Bayport Concrete
    sales@bayport.io
    Opened 12 min ago · awaiting reply
    Opened
  • CEMEX Houston North
    AI-assisted call · voicemail
    No bid · over volume threshold
    No bid
Auto-reminder at T+24h for opened-but-no-reply suppliers. Voice follow-up at T+48h.

Step 2 · Compare

See the real landed cost — not just the base price.

Three quotes, one apples-to-apples view. Inline flags catch missing fees and short-load risk before you award. Lowest base $/CY rarely wins.

See Quote Leveling
Quote Leveling — 4,000 PSI · 80 CY · Houston, TX
Lone Star Ready Mix
Midtown Plant · 2.1 mi
Cheapest base · short-load risk
Base mix (4,000 PSI)
$168/CY
Delivery
$12/CY
Fuel surcharge
$5/CY
Short-load fee
$80 if <8 CY
Weekend premium
Admixtures
$4/CY
Landed cost$189/CY

Quote valid 7 days

Awarded
Gulf Coast Concrete
Pasadena Yard · 6.8 mi
Lowest landed
Base mix (4,000 PSI)
$172/CY
Delivery
$9/CY
Fuel surcharge
$4/CY
Short-load fee
$60 if <9 CY
Weekend premium
Admixtures
$4/CY
Landed cost$189/CY

Quote valid 14 days

Texas Sterling Ready Mix
Sugar Land · 11.3 mi
$75 weekend premium
Base mix (4,000 PSI)
$175/CY
Delivery
$14/CY
Fuel surcharge
$6/CY
Short-load fee
$50 if <10 CY
Weekend premium
$75/load
Admixtures
$4/CY
Landed cost$199/CY

Quote valid 7 days

Lowest base price (Lone Star) would cost the same as the awarded supplier — and risks an extra short-load fee on under-8-CY loads. Leveling shows you the real number before you award.

Step 3 · Capture

Mobile photo of the ticket → matched to the PO automatically.

Foreman snaps a delivery slip; we read every field. Auto-matched by mix, project, supplier, and delivery window. Mix substitutions flagged on the spot.

See Ticket Capture
Ticket Capture — PO #2847 · Building C slab
Today · 7:46 AM
LONE STAR READY MIX
Delivery Ticket #41207
Plant
Midtown
Truck
317
Batch
7:42 AM
Qty
8.5 CY
Mix
45F-3
Driver: ✓ J. Reyes
Tap to confirm
Matched to PO #2847

Extracted from photo

Ticket #
41207
Plant
Midtown
Truck #
317
Batch time
7:42 AM
Quantity
8.5 CY
Mix code
45F-3
Driver signature
✓ Signed
Linked to PO
2847 · Building C slab · Lone Star Ready Mix

Auto-matched by mix, project, supplier, and delivery window.

Step 4 · Reconcile

Three-way match catches the variance before AP signs.

Invoice ↔ PO ↔ tickets, line by line. Standby billed without evidence, environmental fee not on the quote, mix mismatch — all flagged with the dispute packet ready to send.

See Invoice Reconciliation
Invoice Reconciliation — Lone Star Ready Mix #INV-9214
Invoice total
$15,510
Expected
$14,770
Variance
+$740
Flags
3
  • Base mix · 4,000 PSI
    +$320
    Invoice: $172/CY × 80 CY = $13,760
    PO + tickets: $168/CY × 80 CY = $13,440
    Unit price drift
  • Quantity delivered
    +2.5 CY
    Invoice: 82.5 CY billed
    PO + tickets: 80 CY (10 tickets × 8.0–8.5 CY)
    Qty mismatch · check tickets
  • Delivery surcharge
    Match
    Invoice: $960
    PO + tickets: $960
  • Short-load fee
    Valid
    Invoice: $60 (one load 7.6 CY)
    PO + tickets: Threshold $60 if <8 CY · valid
  • Standby — Saturday
    +$90
    Invoice: 45 min × $2/min = $90
    PO + tickets: No field-note evidence
    Standby · evidence required
  • Environmental fee
    +$330
    Invoice: $4/CY × 82.5 CY = $330
    PO + tickets: Not on quote
    Unexpected fee · not on quote
We compose the dispute packet for you — annotated invoice, ticket photos, PO snapshot.
ApproveDispute · $740

Step 5 · Intelligence

See what concrete is actually costing you across every project.

Spend by supplier, fee leakage by category, supplier performance, quote turnaround, variance recovered. Every chart drills back to the source documents.

See Spend Intelligence
Spend Intelligence — Houston metro · trailing 12 months
Concrete spend
$1.8M
521 loads · 12 mo
Avg landed
$192/CY
3% under benchmark
Variance recovered
$53k
2.5% of spend
Avg quote turnaround
3.2 hr
Median across suppliers

Spend by supplier

  • Lone Star Ready Mix$612k
    184 loads1.4% variance rate
  • Gulf Coast Concrete$489k
    142 loads0.6% variance rate
  • Texas Sterling Ready Mix$328k
    96 loads2.9% variance rate
  • Bayport Concrete$211k
    58 loads1.1% variance rate
  • CEMEX Houston North$174k
    41 loads3.7% variance rate

Where it leaked

By fee category
  • Standby — no field-note evidence$15k
  • Unexpected environmental fees$12k
  • Short-load fee misapplied$10k
  • Unit-price drift between quote + invoice$8k
  • Weekend premium on weekday loads$5k
  • Other$4k
Click any line to drill into the source documents — invoices, tickets, POs.

Stop guessing on concrete costs.