Product · Invoice Reconciliation

Approve concrete invoices with the quote, PO, and tickets attached.

Three-way match across invoice, PO, and tickets. Variance flags surface unit-price, quantity, missing-ticket, and unexpected-fee discrepancies before AP signs.

Invoice Reconciliation — Lone Star Ready Mix #INV-9214
Invoice total
$15,510
Expected
$14,770
Variance
+$740
Flags
3
  • Base mix · 4,000 PSI
    +$320
    Invoice: $172/CY × 80 CY = $13,760
    PO + tickets: $168/CY × 80 CY = $13,440
    Unit price drift
  • Quantity delivered
    +2.5 CY
    Invoice: 82.5 CY billed
    PO + tickets: 80 CY (10 tickets × 8.0–8.5 CY)
    Qty mismatch · check tickets
  • Delivery surcharge
    Match
    Invoice: $960
    PO + tickets: $960
  • Short-load fee
    Valid
    Invoice: $60 (one load 7.6 CY)
    PO + tickets: Threshold $60 if <8 CY · valid
  • Standby — Saturday
    +$90
    Invoice: 45 min × $2/min = $90
    PO + tickets: No field-note evidence
    Standby · evidence required
  • Environmental fee
    +$330
    Invoice: $4/CY × 82.5 CY = $330
    PO + tickets: Not on quote
    Unexpected fee · not on quote
We compose the dispute packet for you — annotated invoice, ticket photos, PO snapshot.
ApproveDispute · $740

Invoice extraction

We read every line item — base, fees, tax, total, ticket references. Low-confidence reads go to a review queue.

Three-way match

Invoice ↔ PO ↔ delivery tickets, paired automatically by supplier, project, and date.

Unit price variance

"Invoice $186/CY; PO $178/CY." Catch the supplier increase before payment.

Quantity variance

"Invoice bills 92 CY; tickets total 86 CY." The 6 missing yards surface with the ticket gap visible.

Unexpected fees

Environmental fee not in the quote? Standby without a field-note delay? Saturday premium on a Tuesday? Each is a typed flag with evidence inline.

Dispute packet

One click generates a PDF: annotated invoice, matched ticket photos, PO snapshot. Send to the supplier rep from the platform.

ERP handoff

Approved invoices flow to your ERP via integration or PDF / CSV / email. Variance audit trail stays with the record either way.

Catch the variance before the check goes out.

The free spend audit usually finds 1–3% recoverable variance on the first run.